buildabath.com

The Final Product

It's a good idea to complete all paint work before the finish plumbing and electrical are installed. Often enough though, we get requests to install the potty as soon as practical.

The finish plumbing can now be installed . This consists of the toilet, sink, faucet, and tub/shower faucet trim and their related parts. The finish electrical also goes in at this time. It includes the light fixture and exhaust fan as well as the switches, outlets, and cover plates. The final items to be installed include any mirrors, the towel bars, robe hooks, paper holders, shower doors.

There is usually a final inspection by the local building department often with a check to see that every bedroom and hallway has a smoke detector (an often annoying but prudent safety requirement). If we have done our job, your new bathroom is ready for years of satisfactory service.

<< previousquestions >>

top of page / home / © Sendan Construction Associates / contact us: email@buildabath.com